|
Ave. Floor Area: 94 sq m
OUTLINE SPECIFICATIONS
HOUSE MODEL :
3 STOREY TOWNHOUSE (Premiere series)
LOT AREA
33.00 t0 59.00 Sqm
FLOOR AREA
93.00 to 109.00 Sqm
Exterior Walls & Finishes
6 “ thick CHB w/ Plain cement, Painted
Interior Walls & Finishes
4 “ thick CHB w/ Plain cement finish, Painted
Bedroom Partitions:
Fiber cement board (Hardiflex) , Painted
Roofing Sheets:
Rib type pre colored roofing sheets
Roof Framin:
Steel Rafters & C-purlins / Hat batens type
Fascia BoarD:
“ thick Hardi Senepa
Gutter / Bended Accessories:
Pre-painted G.I Sheets / Spanish Gutter type
Ground Floor Ceiling & Finishes:
No ceiling on ground floor except on T&B; Fiber cement board on T & B
Second Floor Ceiling & Finishes:
Textured paint(versatex) on ground floor ceiling finish
Third Floor Ceiling & Finishes:
No ceiling on second floor except on T &B; Fiber Cement board ceiling. Textured Paint(versatex) on ceiling
�Fiber cement board ceiling on a 2” x 2” wooden ceiling joist @0.60 m o.c. bothways, textured painted (versatex fin)
Doors
Panel doors on Main Door, and Service Doors, Flush hollow core doors on all rooms, PVC Door on T & B
Windows
Steel Casement with 1/8” thick clear glass
T&B Finishes
200mm x 200mm glazed and unglazed ceramic tiles with tile trim @1.80 m in height wall glazed tiles
Kitchen Counter, Cabinet
200mm x 200mm ceramic tiles w/ stainless kitchen sink with 0.40 m inheight splash board with tile trim
Ground Floor & Finishes
Reinforced Concrete slab on fill 400mm x400mm ceramic floor tiles
Second Floor & Finishes
Reinforced Concrete suspended slab 400mm x400mm ceramic floor tiles
Third Floor & Finishes
Laminated Floor
Garage/ Carport
Outdoor Tiles
Plumbing
HCG Brand: Complete fixtures
Electrical
National/ Clipsal Brand or its equal : Complete fixtures
Septic Tank
One-unit
Stairs
Concrete Stair with Wooden Handrail / steel grills Concrete stringer
Counter base cabinet
Cabinets
Built in cabinet on two (2) bedrooms ’ thick plywood on a 2” x 3” wooden frame
UNIT AREA
LOT AREA : 41 SQ M
FLR AREA: 93 SQ M
UNIT CLASSIFICATION: END UNIT
SELLING PRICE: 3,506,000.00
MISC. �EXPENSES 7%: 245,420.00
TOTAL CONTRACT: 3,751,420.00
30% DP : 1,125,426.00 (net of P 50,000 Res.Fee)
MO DP for 11 mos : 97,766.00
.70% : 2,625,994.00
AMA BANK FINANCING
5 YRS (9.75% p.a.) : 55,472.14
10 YRS (9.75% p.a.): 34,340.19
15 YRS (9.75% p.a.): 27,818.80
20 YRS (9.75% p.a.): 24,908.00
Submission Date: 12-04-2008
Last Update: 12-04-2008
|